Whitlam Stage 3A&3C

Group One were engaged by Suburban Land Agency to construct Stages 3 of Whitlam which provides 372 blocks, including single residential lots and multi-unit sites, of which Stage 3A for civil engineering and landscape works includes a total of 83 residential blocks and 5 multi-unit blocks, and Stage 3C includes a total of 170 residential blocks and a future school site.

Works currently underway include earthworks, pavement construction, sewer & water reticulation, storm water drainage, conduits, subsoil drainage, kerb and gutter, concrete paving, traffic control, environmental protection, asphalt and sealing, streetlights, line marking, sign posting and landscaping.