Academy Close Campbell
The site, which has an area of 2.75Ha, is being redeveloped to accommodate 30 residential dwellings for Defence personnel. Group One were engaged by Defence Housing Australia (DHA) to complete the civil works package that includes all works typical to those required for a residential land sub-division and a housing construction package.
Works currently underway include demolishing and removing the existing infrastructure on the site, earthworks, pavement construction, sewer & water reticulation, storm water drainage, conduits, subsoil drainage, kerb and gutter, concrete paving, traffic control, environmental protection, asphalt and sealing, streetlights, line marking, sign posting and landscaping.