Whitlam Stage 2B

Group One were engaged by Suburban Land Agency to construct Stage 1 of Whitlam in ACT which provides 542 blocks, including single residential lots and multi-unit sites, of which this Stage 2B for civil engineering and landscape works included a total of 130 blocks, being 127 detached blocks and 3 multi-unit blocks.

Works included earthworks, pavement construction, sewer & water reticulation, storm water drainage, conduits, subsoil drainage, kerb and gutter, concrete paving, traffic control, environmental protection, asphalt and sealing, streetlights, line marking, sign posting and landscaping.