THROSBY 3

Group One was awarded the  $15m Throsby Estate Stage 3 in November 2015. Construction of all infrastructure to service approximately 240 blocks.Works included earthworks, pavement construction, sewer & water reticulation, stormwater drainage, conduits, subsoil drainage, kerb and gutter, concrete paving, traffic control, environmental protection, asphalt and sealing, streetlights, line marking, sign posting and landscaping.

With the major earthworks and hydraulics completed, driveways, paths asphalt and street lights are underway. The project is on target for completion in Jan17 despite the 2016 winter rainfalls.