TAYLOR 2 Stage 3
Group One were engaged by Suburban Land Agency to construct all infrastructure to service approximately 212 single residential and 4 multi unit blocks at Taylor 2 Stage 3 in ACT.
Works included but not limited to major box culvert bridge, fire trail, GPT, concrete Drop structures earthworks, pavement construction, sewer & water reticulation, storm water drainage, conduits, subsoil drainage, kerb and gutter, concrete paving, traffic control, environmental protection, asphalt and sealing, streetlights, line marking, sign posting and landscaping.