TAYLOR 2 Stage 4A

Group One were engaged by Suburban Land Agency to construct all infrastructure to service approximately 104 single residential and 2 multi unit blocks at Taylor 2 Stage 4A in ACT.

Works included but not limited to GPT, earthworks, pavement construction, sewer & water reticulation, storm water drainage, conduits, subsoil drainage, kerb and gutter, concrete paving, traffic control, environmental protection, asphalt and sealing, streetlights, line marking, sign posting and landscaping.