Alivio Tourist Park

The existing site consisted of camping ground which was transformed into Alivio Garden and 3 Bedroom Villa Precinct with construction of all infrastructure works including earthworks, in ground service works, concrete works, pavement construction, stormwater drainage, conduits, subsoil drainage, kerb and gutter, environmental protection, asphalt and sealing, streetlights, line marking, sign posting and landscaping to install 21 New Cabins on the site. Group One were engaged by Tourapark Pty Ltd to delivery these works.