Skip to main content

02 6241 1955

Wright image

With Operational Acceptance granted Stage 1B-2 of Wright is now open to traffic. The opening of this stage now brings the total blocks complete at Wright to 360,  along with 5 multi-unti sites and multiple open space areas. Construction of Wright Stage 2 is moving very fast and on track for completion pre-Christmas 2012.