Group One’s scope included taking preliminary design through to final design acceptance and then physical construction of the works. Construction activities included installation of 1.5km of DICL trunk watermain; in-line centrifugal pumps; electrical design, switchboards & connections; pump station structure; concrete pavements, kerbs & landscaping.

Construction of the Booster Pump Station was completed in 2010, for a total contract value of $2.4 million.